Read and keep the obligations register
Every gate on the deal, banded by the surface it belongs to, with what blocks and what has been waived.
An obligation is a gate: something that must be satisfied before an event may happen. Origination diligence, a per-draw checklist, an agency condition and a lender's standing requirement are all obligations, and they are all read here.
Each row shows its status, whether an outstanding item blocks the event it is attached to, and where a waiver was granted, who granted it and why.
When it is due
A row's Due date is resolved, not typed. An obligation due a fixed number of days after a milestone, such as a dedication seven years after paved access, is dated off that milestone and moves when the milestone moves. Until the milestone is recorded the cell reads "awaiting" the event it waits on rather than sitting blank, and a standing constraint with no due date says so. An option's window resolves the same way, so a window anchored to a milestone can close on a date the project already knows.
Banded by surface, not one flat list
The bands are the different points in a deal an obligation applies at. A single list sorted by title would bury a standing agency condition under forty rows of one draw's checklist, and the two are not the same kind of question.
Where the verdicts come from
This page adds no rules of its own. A per-draw item's blocking rule is the same rule the draws page reads, and this register shows the rows every other surface already writes.
Entering a gate
Add obligation records a gate the draw did not: what has to happen, its kind and the surface it applies at, who answers for it from the party register, which contract it sits under, and when it is due. The due rule is the same grammar every other date uses: a fixed date, a number of days or months after an event or a schedule task, or no date at all for a standing obligation. Somebody with documents access at edit records it, and the row it writes is the same row a draw's checklist writes for its own gate.
Editing a row opens the same form, with where it stands beneath it: open, satisfied, or waived. Waiving needs documents access at approve, the floor a waiver on a draw checklist is held to. Overdue is never recorded; it is read off the due date.
The draw's own gates are the exception. A per-draw or per-advance row is answered item by item from the Draws tab, and the register reads those rows without offering to edit them.
Who can
- Documents at view or better: anyone who can read documents.
- Documents at edit or better: anyone who can upload and file documents.
How to
You open this when you need to know what is still holding an event up.
- Switch project carries this deal. The obligations register is a project page: All projects has no version of it.
- Every gate on this project, grouped by the surface it hangs off, with what is outstanding.
- A blocking item holds up the event it gates. A waived one names who granted it and why.
- Add obligation records a gate the draw did not: what has to happen, its kind and surface, who answers for it, and when.
- What satisfies a row is evidence, and evidence is a document on this project's register. Filing it is what closes the gate.
Related pages
Known limits
An obligation carries no note of its own. The items under it do, and a waiver records why it was granted, but the gate row is its title, kind, surface, party, contract and due rule.