Documentation

Compare budget against actual costs

Each project's budget beside the costs pulled from your accounting file, rolled up at book level.

Budget vs. actual reads your accounting file and puts the costs it holds next to the budget they were spent against. This page is the roll-up, one row per project. The same tab inside a project breaks the figures out per cost code.

The costs shown are whatever the last successful sync wrote. A connection that has stopped working does not blank the figures, it stops them moving, so the page states when each connection last ran rather than letting a stale number imply a live one.

Where the costs come from

A cost is matched to a budget line when it is pulled, not when this page is drawn. Values that have not been mapped to a project or a cost code do not count toward a budget, which is the right answer for the accounts a developer does not track as job costs. The mapping page is where that is decided.

Who can

  • Money at view redacted or better: anyone who can track budget status without seeing amounts.

Levels are set per person in Settings and people. What each level means.

How to

The step-by-step walkthrough for this page comes from the in-app guide, which is not on this release yet. Everything above describes what the screen does and who can open it.

Show me in the app

Known limits

At view_redacted on money the project list and its shape are shown with every figure as a dash. Nothing on this page is summed for a reader who may not see the amounts.

The connection between PadFlow and a real accounting company file has not been run end to end outside a sandbox. The mapping and the roll-up work on real data; the sync that fills them has been exercised against staged files only.